MOD Resources Limited reported additional promising intersections from its initial drilling phase at the large A4 Dome. The >5km long A4 Dome forms part of the T3 Expansion Project held 70% by MOD and 30% by Joint Venture (JV) partner, Metal Tiger Plc and lies only 8km from the 100% owned 60Mt T3 Copper Project. Due to the large size of the A4 Dome, widely spaced drilling to date has tested less than one third of the prospective area. A combination of vein-hosted and NPF contact copper mineralisation was intersected in most holes with potential extending well beyond the initial 1,600m long target area. In addition to substantial widths of disseminated and NPF contact mineralisation, forming a blanket below the A4 Dome, there are wide zones of vein-hosted mineralization at shallower depths in the dome (eg 52m @ 1.5% Cu & 14g/t Ag from 232.2m in MO-A4-003D announced 6 August 2018 and 42.9m @ 1% Cu & 19g/t Ag from 257.5m in MO-A4-008D and 15m @ 1.1% Cu & 16g/t Ag from 39m and 21m @1.1% Cu & 8g/t Ag from 59m in MO-A4-019D).