Jadestone Energy plc provided production guidance for the year 2024. For the period, production guidance range is narrowed from 20-23,000 boe/d to 20-22,000 boe/d. The change to the upper end of guidance reflects first quarter Group production performance, which was impacted by both planned and unplanned downtime across the portfolio. Current internal forecasts point to an outcome at the lower end of the updated guidance range, based on first commercial gas sales from Akatara in June 2024, albeit there remains a wide range of possible outcomes, principally based on the timing and nature of Akatara's ramp up, as well as initiatives underway to optimise production at the Group's current producing assets.