Skanska has signed an additional contract with the
The project is one in a series of major capital projects. Specifically, the 6,100-square meter renovation will include new offices, open engineering research labs, classrooms, biology and chemistry teaching labs, and collaboration spaces. The approximately 13,400-square meter addition will include new state-of-the-art open-bay chemistry research labs with chemical storage, material support, and facility service spaces.
Work began in 2023 and is expected to reach phased occupancy starting in
For further information please contact:
Direct line for media, tel +46 (0)10 448 88 99
This and previous releases can also be found at www.skanska.com.
https://news.cision.com/skanska/r/skanska-signs-an-additional-contract-for-renovation-and-expansion-at-a-university-in-ohio--usa--for-,c3950208
https://mb.cision.com/Main/95/3950208/2688240.pdf
(c) 2024 Cision. All rights reserved., source