14 APRIL 2022
PARKS REEF CONFIRMED AS A 5E PGM1 OREBODY AS COMPLETED ASSAYS CONFIRM PRESENCE OF HIGH VALUE RHODIUM AND IRIDIUM
Podium Minerals Limited (ASX: POD, 'Podium' or 'the Company') is pleased to announce that final assay results from a strategic value addition programme testing historic 3E PGM2 intercepts has confirmed high-grade, high-value Rhodium (Rh) and Iridium (Ir) mineralisation. These results along with previous reported assay testing (see announcement 28 March 2022) support the Company in its definition of a 5E PGM orebody at the Parks Reef PGM Project in Western Australia.
HIGHLIGHTS
• Completed assay results covering 127 historic holes (2,740 samples) confirm the presence of high-grade, high-value Rhodium as well as Iridium at Parks Reef along the 15km strike length.
• Newly tested intercepts showing high-grade Rh include:
o 13m at 3.87g/t 3E PGM, 0.15g/t Rh and 0.10g/t Ir for a total of 4.12g/t 5E PGM from 34m
- Incl.1m at 5.55g/t 3E PGM, 0.20g/t Rh and 0.13g/t Ir for a total of 5.88g/t 5E PGM from 37m
- Incl. 2m at 4.51g/t 3E PGM, 0.20g/t Rh and 0.13g/t Ir for a total of 4.84g/t 5E PGM from 39m
o 3m at 2.84g/t 3E PGM, 0.23g/t Rh and 0.09g/t Ir for a total of 3.16g/t 5E PGM from 24m
o 7m at 2.60g/t 3E PGM, 0.12g/t Rh and 0.05g/t Ir for a total of 2.76g/t 5E PGM from 36m
• Rhodium and Iridium contribute approximately 5%-6% increase in PGM weight to the existing reported 3E PGM mineral resource. This small increase in weight indicatively adds 30% in value to the weighted price per PGM ounce at Parks Reef.
• Rhodium is considered one of the rarest and most valuable metals in the world, currently valued at US$19,200/oz3 and is a critical 'green' metal used primarily as an auto catalyst to reduce harmful nitrous oxide gases from light vehicle gasoline emissions.
Commenting on the completion of the value adding initiative, CEO and Managing Director, Sam Rodda said, "These results place us well on the path to being Australia's first 5E platinum group metals producer with our 15km long Parks Reef Project revealing the presence of high-grade, high-value Rh and Ir throughout the orebody, both of which are extremely valuable metals. To put this into perspective, with Rh currently trading above US$19,000 per ounce and Ir trading around US$5,100 per ounce4, these results have the potential to add approximately 30% in value to the weighted price per PGM ounce at Parks Reef."
1 5E PGM refers to platinum (Pt) plus palladium (Pd) plus gold (Au) plus Iridium (Ir) plus Rhodium (Rh) expressed in units of g/t
2 3E PGM refers to platinum (Pt) plus palladium (Pd) plus gold (Au) expressed in units of g/t
3 Source: Johnson Mattheyhttps://platinum.matthey.com 12/04/2022
4 Source: Johnson Mattheyhttps://platinum.matthey.com 12/04/2022
CONFIRMATION OF SIGNIFICANT RHODIUM AND IRIDIUM ALONG OREBODY STRIKE
Podium has now completed its historical analysis of archived pulp samples, testing for all platinum group elements, to confirm the presence of Rh and Ir continuity within the 15km long proven orebody.
Completion of this initiative, that was designed to add further value to the existing inferred resource, involved the assay of 2,740 historic samples from 127 holes, which were selected from intervals having anomalous 3E
PGM values.
The programme commenced in early February 2022, testing samples stored in Perth at the Bureau Veritas (BV) facility.
Figures 1 and 2 show the drill holes assayed historically and as part of this current programme, for which 5E PGM results have now been received (blue and red dots). The blue dots represent holes containing 5E PGM assays for Rh ≥0.10g/t over intervals ≥2m.
Figure 1. Aerial image of the Parks Reef Project, showing 5E PGM assay status - East view
PRRC007 | 6m at 2.25g/t 3E PGM, 0.16g/t Rh and 0.07g/t Ir for a total of 2.48g/t 5E PGM from 15m |
Incl. | 1m at 2.77g/t 3E PGM, 0.24g/t Rh and 0.10g/t Ir for a total of 3.10g/t 5E PGM from 19m |
PRRC009 | 10m at 2.14g/t 3E PGM, 0.12g/t Rh and 0.06g/t Ir for a total of 2.32g/t 5E PGM from 20m |
PRRC042 | 13m at 3.87g/t 3E PGM, 0.15g/t Rh and 0.10g/t Ir for a total of 4.12g/t 5E PGM from 34m |
Incl. | 1m at 5.55g/t 3E PGM, 0.20g/t Rh and 0.13g/t Ir for a total of 5.88g/t 5E PGM from 37m |
Incl. | 2m at 4.51g/t 3E PGM, 0.20g/t Rh and 0.13g/t Ir for a total of 4.84g/t 5E PGM from 39m |
PRRC094 | 3m at 2.84g/t 3E PGM, 0.23g/t Rh and 0.09g/t Ir for a total of 3.16g/t 5E PGM from 24m |
PRRC098 | 7m at 2.60g/t 3E PGM, 0.12g/t Rh and 0.05g/t Ir for a total of 2.76g/t 5E PGM from 36m |
PRRC170 | 7m at 2.17g/t 3E PGM, 0.14g/t Rh and 0.06g/t Ir for a total of 2.36g/t 5E PGM from 20m |
Incl. | 1m at 3.40g/t 3E PGM, 0.21g/t Rh and 0.10g/t Ir for a total of 3.71g/t 5E PGM from 23m |
Figure 2. Aerial image of the Parks Reef project, showing 5E PGM assay status - West view
Significant Rh intercepts from the recent results received are based on 0.1g/t Rh intervals5 multiplied by the Rh grade. These include:
5 The interval multiplied by grade is to be =>0.5 for the intercept to be considered significant.
Sam Rodda | Skye Gilligan |
Chief Executive Officer & Managing Director | Media & Investor Relations |
samr@podiumminerals.com | skye@gilligangroup.com.au |
+61 8 9218 8878 | +61 416 854 264 |
ABOUT PODIUM MINERALS LIMITED |
The recent results confirm presence of Rh and Ir within the full strike of the orebody and have similar grade and widths to the previously announced interim results6 from approximately 700 samples for 31 holes (see ASX announcement dated 28 March 2022).
The completed assay programme shows an average increase in 5E PGM grade from 3E PGM grade of between 5%-6%, and on average Rh and Ir represent 3%-4% and 1%-2% of the total 5E PGM grade respectively. The high value of Rh and Ir indicatively adds 30% to the weighted value of a Parks Reef PGM ounce based on current Rh and Ir prices.
Future mineralised drill results will continue to be tested for the full PGM suite as drilling progresses.
For further information, please contact:
Podium Minerals Limited is an ASX listed exploration and resources development company focused on platinum group metals, gold and base metals.
The Company's 100% owned extensive Parks Reef PGM Project comprises a 15km strike of near surface PGM-Au-base metal mineralisation which is located within our mining leases in the Mid-West Region of Western Australia.
Podium is targeting high value metals with strong market fundamentals and growth prospects with a strategy to rapidly develop an alternative supply of PGMs to the world market.
COMPETENT PERSONS STATEMENT
The information in this announcement that relates to the Parks Reef Project is based on and fairly represents information compiled by Mr. Doug Cook (Exploration Manager for Podium Minerals Limited).
Mr. Cook is a member of the Australasian Institute of Mining and Metallurgy.
Mr. Cook has sufficient experience of relevance to the styles of mineralisation and types of deposits under consideration, and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.
Mr. Cook consents to the inclusion in this report of the matters based on their information in the form and context in which they appear.
6 Refer to ASX announcement dated 28 March 2022
APPENDIX A
FULL LIST OF 5E PGM RESULTS
Hole ID | ||||||
mE | mN | |||||
PRRC001 | 570559 | 7028336 | 5 | 24 | 19 | 112 |
incl. | 17 | 19 | 2 | 10 | ||
PRRC002 | 570564 | 7028325 | 20 | 38 | 18 | 105 |
PRRC003 | 570370 | 7028261 | 4 | 21 | 17 | 107 |
incl. | 15 | 19 | 4 | 16 | ||
PRRC004 | 570378 | 7028246 | 23 | 41 | 18 | 100 |
PRRC005 | 570201 | 7028158 | 34 | 52 | 18 | 114 |
PRRC006 | 570206 | 7028146 | 55 | 71 | 16 | 81 |
PRRC007 | 569836 | 7027976 | 7 | 23 | 16 | 162 |
incl. | 15 | 21 | 6 | 43 | ||
incl. | 19 | 20 | 1 | 51 | ||
PRRC008 | 569842 | 7027966 | 27 | 39 | 12 | 101 |
incl. | 34 | 38 | 4 | 30 | ||
PRRC009 | 569677 | 7027845 | 20 | 32 | 12 | 74 |
incl. | 20 | 30 | 10 | 80 | ||
PRRC010 | 569683 | 7027836 | 37 | 53 | 16 | 68 |
incl. | 48 | 53 | 5 | 11 | ||
PRRC011 | 569197 | 7027486 | 10 | 25 | 15 | 176 |
incl. | 21 | 24 | 3 | 23 | ||
PRRC012 | 569203 | 7027476 | 26 | 45 | 19 | 79 |
PRRC013 | 569054 | 7027339 | 32 | 34 | 2 | 267 |
PRRC013 | 569054 | 7027339 | 43 | 49 | 6 | 18 |
PRRC014 | 569060 | 7027330 | 41 | 54 | 13 | 252 |
incl. | 49 | 53 | 4 | 25 | ||
PRRC015 | 568898 | 7027215 | 12 | 18 | 6 | 130 |
PRRC016 | 568904 | 7027205 | 20 | 25 | 5 | 52 |
PRRC017 | 569528 | 7027715 | 7 | 21 | 14 | 84 |
incl. | 16 | 18 | 2 | 12 | ||
PRRC018 | 569521 | 7027725 | 2 | 5 | 3 | 25 |
PRRC019 | 569368 | 7027597 | 15 | 30 | 15 | 156 |
incl. | 24 | 30 | 6 | 14 | ||
PRRC020 | 569374 | 7027588 | 32 | 49 | 17 | 48 |
incl. | 43 | 46 | 3 | 10 | ||
PRRC021 | 568743 | 7027087 | 25 | 34 | 9 | 53 |
incl. | 28 | 32 | 4 | 40 | ||
incl. | 29 | 30 | 1 | 43 | ||
PRRC022 | 568749 | 7027077 | 40 | 47 | 7 | 8 |
PRRC023 | 570582 | 7028291 | 77 | 97 | 20 | 77 |
incl. | 94 | 96 | 2 | 7 | ||
PRRC024 | 568764 | 7027055 | 84 | 90 | 6 | 23 |
PRRC025 | 570419 | 7028176 | 159 | 180 | 21 | 101 |
PRRC026 | 570230 | 7028111 | 121 | 132 | 11 | 166 |
incl. | 128 | 130 | 2 | 92 | ||
PRRC027 | 570071 | 7027980 | 102 | 118 | 16 | 70 |
PRRC028 | 569861 | 7027932 | 88 | 102 | 14 | 78 |
incl. | 99 | 101 | 2 | 7 | ||
incl. | 100 | 101 | 1 | 7 | ||
PRRC029 | 569722 | 7027767 | 142 | 161 | 19 | 69 |
incl. | 155 | 160 | 5 | 11 | ||
PRRC030 | 569551 | 7027673 | 80 | 100 | 20 | 95 |
incl. | 96 | 99 | 3 | 12 | ||
PRRC031 | 569404 | 7027515 | 152 | 164 | 12 | 97 |
PRRC032 | 569224 | 7027440 | 84 | 100 | 16 | 44 |
MGA Z50 (GDA 94)
FN001 | ||||||
Au_ppb | Pt_ppb | Pd_ppb | 3E g/t | Ir_ppb | Rh_ppb | 5E g/t |
1092 | 848 | 2.05 | 42 | 89 | 2.18 | |
2160 | 1255 | 3.43 | 104 | 244 | 3.77 | |
992 | 756 | 1.85 | 29 | 58 | 1.94 | |
869 | 901 | 1.88 | 28 | 53 | 1.96 | |
1166 | 1365 | 2.55 | 61 | 119 | 2.73 | |
764 | 580 | 1.44 | 23 | 41 | 1.51 | |
749 | 551 | 1.41 | 21 | 38 | 1.47 | |
738 | 741 | 1.56 | 20 | 38 | 1.62 | |
1237 | 900 | 2.30 | 40 | 90 | 2.43 | |
1336 | 866 | 2.25 | 67 | 163 | 2.48 | |
1870 | 844 | 2.77 | 95 | 235 | 3.10 | |
852 | 634 | 1.59 | 36 | 82 | 1.71 | |
1052 | 762 | 1.84 | 59 | 140 | 2.04 | |
1110 | 769 | 1.95 | 54 | 118 | 2.13 | |
1236 | 827 | 2.14 | 57 | 123 | 2.32 | |
785 | 716 | 1.57 | 31 | 74 | 1.67 | |
863 | 680 | 1.55 | 54 | 129 | 1.74 | |
948 | 782 | 1.91 | 36 | 61 | 2.00 | |
1115 | 719 | 1.86 | 75 | 122 | 2.05 | |
791 | 674 | 1.54 | 25 | 46 | 1.62 | |
938 | 498 | 1.70 | 10 | 15 | 1.73 | |
582 | 642 | 1.24 | 31 | 70 | 1.34 | |
1282 | 798 | 2.33 | 42 | 85 | 2.46 | |
1276 | 787 | 2.09 | 66 | 131 | 2.29 | |
1016 | 705 | 1.85 | 21 | 43 | 1.92 | |
927 | 572 | 1.55 | 38 | 79 | 1.67 | |
985 | 703 | 1.77 | 38 | 62 | 1.87 | |
1230 | 1302 | 2.54 | 63 | 123 | 2.73 | |
383 | 543 | 0.95 | 45 | 97 | 1.09 | |
860 | 669 | 1.69 | 39 | 84 | 1.81 | |
1029 | 763 | 1.81 | 62 | 131 | 2.00 | |
835 | 648 | 1.53 | 34 | 68 | 1.63 | |
958 | 612 | 1.58 | 62 | 125 | 1.77 | |
1181 | 512 | 1.75 | 47 | 91 | 1.88 | |
1305 | 577 | 1.92 | 75 | 144 | 2.14 | |
1850 | 750 | 2.64 | 95 | 205 | 2.94 | |
770 | 480 | 1.26 | 46 | 76 | 1.38 | |
779 | 703 | 1.56 | 16 | 43 | 1.62 | |
1170 | 854 | 2.03 | 53 | 131 | 2.22 | |
691 | 562 | 1.28 | 36 | 79 | 1.39 | |
736 | 697 | 1.53 | 20 | 41 | 1.59 | |
1393 | 774 | 2.33 | 50 | 98 | 2.48 | |
4760 | 2850 | 7.70 | 217 | 467 | 8.39 | |
707 | 712 | 1.49 | 23 | 49 | 1.56 | |
776 | 733 | 1.59 | 28 | 58 | 1.67 | |
1420 | 990 | 2.42 | 78 | 153 | 2.65 | |
1740 | 1160 | 2.91 | 105 | 200 | 3.21 | |
749 | 757 | 1.58 | 28 | 58 | 1.66 | |
863 | 731 | 1.61 | 52 | 110 | 1.77 | |
768 | 738 | 1.60 | 28 | 59 | 1.68 | |
871 | 769 | 1.65 | 50 | 112 | 1.81 | |
739 | 692 | 1.53 | 22 | 35 | 1.59 | |
756 | 764 | 1.56 | 33 | 75 | 1.67 |
FromToLength
FA003
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Podium Minerals Ltd. published this content on 13 April 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 13 April 2022 22:24:02 UTC.