Shares Outstanding: 326,382,261
Trading Symbols: TSX: GGD
OTCQX: GLGDF
491 g/t AgEq over 27.3m including 7.6m of 1,670 g/t AgEq including 0.9m of 8,115 g/t AgEq
"We're happy with the results from our additional hundred drill holes in the Main zone at Los Ricos South since our initial
Hole ID | Area / Vein | From | To | Length1 | Au | Ag | AuEq2 | AgEq2 |
(m) | (m) | (m) | (g/t) | (g/t) | (g/t) | (g/t) | ||
LRGG-23-316 | Main area | 249.0 | 276.3 | 27.3 | 1.27 | 395.6 | 6.54 | 490.6 |
including | 255.0 | 262.7 | 7.6 | 4.43 | 1,337.6 | 22.26 | 1,669.5 | |
including | 261.0 | 261.9 | 0.9 | 11.80 | 7,230.0 | 108.20 | 8,115.0 | |
LRGG-23-303 | Main area | 33.3 | 43.4 | 10.1 | 0.53 | 91.7 | 1.75 | 131.3 |
including | 40.5 | 42.0 | 1.5 | 0.99 | 150.0 | 2.99 | 224.3 | |
LRGG-23-304 | Main area | 53.9 | 63.8 | 10.0 | 1.82 | 181.2 | 4.24 | 318.1 |
including | 59.0 | 60.5 | 1.5 | 4.34 | 633.0 | 12.78 | 958.5 | |
LRGG-23-305 | Main area | 20.3 | 33.0 | 12.7 | 0.51 | 111.8 | 2.00 | 150.2 |
including | 27.7 | 28.9 | 1.2 | 1.69 | 487.0 | 8.18 | 613.8 | |
LRGG-23-306 | Main area | 36.1 | 47.8 | 11.7 | 4.99 | 604.8 | 13.05 | 979.0 |
including | 37.7 | 39.2 | 1.5 | 30.50 | 3,550.0 | 77.83 | 5,837.5 | |
LRGG-23-308 | Main area | 159.7 | 173.2 | 13.6 | 1.36 | 157.9 | 3.46 | 259.6 |
including | 164.0 | 169.0 | 5.0 | 2.78 | 246.9 | 6.08 | 455.8 | |
LRGG-23-309 | Main area | 115.3 | 133.9 | 18.6 | 1.50 | 89.4 | 2.69 | 201.8 |
including | 122.3 | 122.9 | 0.6 | 12.05 | 144.0 | 13.97 | 1,047.8 | |
LRGG-23-310 | Main area | 39.8 | 55.0 | 15.3 | 0.50 | 74.4 | 1.49 | 112.0 |
including | 47.0 | 49.8 | 2.8 | 1.53 | 249.4 | 4.85 | 364.0 | |
LRGG-23-311 | Main area | 137.4 | 139.1 | 1.7 | 0.42 | 97.6 | 1.72 | 129.0 |
LRGG-23-312 | Main area | 157.0 | 158.0 | 1.0 | 0.80 | 204.0 | 3.52 | 264.0 |
and | 165.5 | 166.5 | 1.0 | 2.14 | 158.0 | 4.25 | 318.5 | |
LRGG-23-313 | Main area | 125.4 | 134.6 | 9.2 | 3.23 | 234.8 | 6.36 | 477.2 |
including | 131.4 | 134.6 | 3.2 | 4.64 | 460.8 | 10.79 | 808.9 | |
LRGG-23-314 | Main area | 123.0 | 131.2 | 8.2 | 0.58 | 98.9 | 1.90 | 142.6 |
including | 130.0 | 131.2 | 1.2 | 0.78 | 291.0 | 4.66 | 349.5 | |
LRGG-23-315 | Main area | 193.3 | 206.7 | 13.4 | 0.66 | 56.6 | 1.42 | 106.2 |
including | 196.3 | 197.6 | 1.3 | 4.87 | 172.5 | 7.18 | 538.1 |
1. | Not true width |
2. | AgEq converted using a silver to gold ratio of 75:1 at recoveries of 100% |
The Main area drilling campaign's purposes is to better define the very high-grade portions of the current deposit that may be amenable to bulk underground mining. These holes are in addition to those drilled in 2019 and 2020 which formed part of the initial Mineral Resource Estimate ("Resource") upon which the Los Ricos South Preliminary Economic Assessment ("PEA") was based upon when it was released on
Figure 2, above, provides a summary of the
Hole ID | Easting | Northing | Elevation | Azimuth | Dip | Length |
LRGG-23-303 | 610444 | 2327886 | 1303 | 50 | -45 | 82 |
LRGG-23-304 | 610444 | 2327885 | 1303 | 50 | -67 | 110 |
LRGG-23-305 | 610367 | 2328148 | 1350 | 50 | -45 | 59 |
LRGG-23-306 | 610350 | 2328133 | 1345 | 50 | -45 | 78 |
LRGG-23-307 | 610255 | 2328050 | 1306 | 50 | -42 | 59 |
LRGG-23-308 | 610426 | 2327675 | 1282 | 50 | -45 | 216 |
LRGG-23-309 | 610437 | 2327744 | 1274 | 50 | -47 | 188 |
LRGG-23-310 | 610329 | 2328131 | 1339 | 55 | -57 | 77 |
LRGG-23-311 | 610183 | 2327997 | 1280 | 50 | -59 | 179 |
LRGG-23-312 | 610183 | 2327997 | 1280 | 50 | -74 | 221 |
LRGG-23-313 | 610604 | 2327564 | 1259 | 50 | -46 | 139 |
LRGG-23-314 | 610548 | 2327620 | 1268 | 50 | -41 | 169 |
LRGG-23-315 | 610324 | 2327703 | 1246 | 45 | -47 | 234 |
LRGG-23-316 | 610324 | 2327703 | 1246 | 45 | -70 | 306 |
VRIFY is a platform being used by companies to communicate with investors using 360° virtual tours of remote mining assets, 3D models and interactive presentations. VRIFY can be accessed by website and with the VRIFY iOS and Android apps.
The VRIFY 3D Slide Deck for GoGold can be viewed at: https://vrify.com/companies/gogold-resources-inc and on the Company's website at: www.gogoldresources.com.
The Company's two exploration projects at its Los Ricos Property are in
The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When the sample lengths are determined, the full core is sawn with a diamond blade core saw with one half of the core being bagged and tagged for assay. The remaining half portion is returned to the core trays for storage and/or for metallurgical test work.
The sealed and tagged sample bags are transported to the
Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples and includes the systematic insertion and monitoring of appropriate reference materials (certified standards, blanks and duplicates) into the sample strings. The results of the assaying of the QA/QC material included in each batch are tracked to ensure the integrity of the assay data. All results stated in this announcement have passed GoGold's QA/QC protocols.
Mr.
CAUTIONARY STATEMENT:
The securities described herein have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the "
This news release may contain "forward-looking information" as defined in applicable Canadian securities legislation. All statements other than statements of historical fact, included in this release, including, without limitation, statements regarding the Los Ricos South and North projects, and future plans and objectives of GoGold, including the intention to undertake further exploration at Los Ricos North, and the prospect of further discoveries there, constitute forward looking information that involve various risks and uncertainties. Forward-looking information is based on a number of factors and assumptions which have been used to develop such information but which may prove to be incorrect, including, but not limited to, assumptions in connection with the continuance of GoGold and its subsidiaries as a going concern, general economic and market conditions, mineral prices, the accuracy of mineral resource estimates, and the performance of the Parral project. There can be no assurance that such information will prove to be accurate and actual results and future events could differ materially from those anticipated in such forward-looking information.
Important factors that could cause actual results to differ materially from GoGold's expectations include exploration and development risks associated with GoGold's projects, the failure to establish estimated mineral resources or mineral reserves, volatility of commodity prices, variations of recovery rates, and global economic conditions. For additional information with respect to risk factors applicable to GoGold, reference should be made to GoGold's continuous disclosure materials filed from time to time with securities regulators, including, but not limited to, GoGold's Annual Information Form. The forward-looking information contained in this release is made as of the date of this release.
View original content to download multimedia:https://www.prnewswire.com/news-releases/gogold-reports-additional-excellent-drilling-at-main-area-of-los-ricos-south-301907434.html
SOURCE
© Canada Newswire, source