Recently, the new CR200J EMU developed by CRRC departed from Xining Station and headed for Golmud. The CR EMU was officially put into operation on the Qinghai-Tibet Railway, and the "Sky Road" has entered the era of EMU.

The new CR200J EMU is a power-centralized EMU specially designed for the environment of high altitude and low temperature along the western section of the Qinghai-Tibet Railway. It adopts the 6-axis power locomotive, with a total traction power of 7200KW, which is about 30% higher than the regular 4-axis CR locomotive. The strong power enables the EMU to start smoothly on an uphill slope of 30‰. It comprises 9 cars (1 motor and 8 tractors), with a maximum speed of 160kw/h and a capacity of 676 passengers.

In order to ensure the safe and stable operation of the CR EMU on the Qinghai-Tibet Railway, CRRC's after-sales service team properly carries out the inspection and preparation of the EMU to provide users with comprehensive technical support and thoughtful services.

Attachments

Disclaimer

CRRC Corporation Limited published this content on 27 July 2023 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 28 July 2023 01:12:08 UTC.