LarrainVial Andean E- Conference

March, 2022

Colombia | Panama | Costa Rica | Honduras

Celsia at a glance

22 hydro

1.250 MWGen.

T&D

6 solar

78 MW

1 wind

50 MW

3 thermalTotal RAB

Consolidated

356 MW

$3,63 Bill.

$0,6 Bill. Caoba

Distribution networks

43.415 kmTransmission networks

274 km

2 district cooling systems in operation

Conventional energy + Beyond-the-metter portfolio

57 back-up facilities operating

4353 Projects - Energy efficiency solutions

~200 USD mill.

Hydro

Grid / Distribution

Distributed solar

Guajira wind projects

Thermal backup

1.290 MW | 3,6 USD bill. RAB

78,1 MW

1,4 USD bill.

~180 USD mill.1

*Receivables with Celsia Colombia, Prime (Termoflores) and C2Energía + Fiduciary assets BLM + Risks management assets

480 MW

CapEx

2021 COP$1,6 Bill.

Growth platforms +$936.000 mill.

Tesorito, C2 Energía (SFV), Caoba

Expansion +$411.000 mill.

Redes, Generación, otros

Continuity +$269.000 mill.

Investments Bill. COP

CapexM&A

2016

2017

2018

2019

2020

2021 YTD

CapEx

2022E COP$4 Bill.

COP 800.000 mill. - Celsia

COP 3.2 Bill. - Platforms

Growth platforms

Largescalesolar (C2), Transmission(Caoba), Thermalbackup(Tesorito).

Expansion

Grid(Tolima/Valle), Generation, Distributedsolar, other.

Continuity

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Celsia SA ESP published this content on 29 March 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 30 March 2022 21:11:22 UTC.