Bumi Armada Berhad

Financial Results Q2 2022

Q2 2022 Health, Safety & Environment

Armada Sterling II

Armada TGT 1

7 years LTI free

10 years LTI free

Armada Sterling

FSU Armada LNG Mediterrana

5 years LTI free

9 years LTI free

Armada Kraken

Karapan Armada Sterling III

4 years LTI free

<1 year LTI free

Armada Olombendo

<1 year LTI free

  • Increased leadership visibility on the FPSOs through an Integrated Assurance schedule.
  • Rolled out a new Process Safety training program.
  • Reviewed the Security Risk Assessment in Astrakhan.
  • Extended scope of emission monitoring.

2

Q2 2022 Sustainability

  • Released Climate Change Policy and commitment as part of our Sustainability Statement.
  • Ongoing studies to lower emissions on new vessels with green engineering.
  • Ongoing studies on better flare management on existing vessels.
  • Initiated the implementation of ISO 50001 Energy Management Standard.
  • Armada LNG Mediterrana achieved SUSTAINABLESHIP-1 certification by Bureau Veritas in April.
  • Completed design of offshore CO2 storage and injection vessel - FSIU.
  • Collaboration with leaders in the sector.
  • Need the large CO2 emitters to capture their emissions.

3

Q2 2022 Sustainability Community Level

Wildlife Rehabilitation Centre

Xrobb l-Ghagin, Malta

Armada Floating Gas Services Malta Ltd. Supports the Wildlife Rehabilitation Centre for the rehabilitation of whales, dolphins, and porpoises.

HCMUT Scholarship Program

Awarded scholarships to engineering students at Ho Chi Minh University of Technology (HCMUT) to facilitate establishing innovative solutions to drive green technology.

4

Q2 2022 Key Operations Update

Armada Kraken

  • Completed annual BEIS inspection
  • Milestone Reached 56.1 million barrels produced

Armada LNG

Mediterrana

  • 3-liquidhybrid hoses renewed
    • Survey for

SUSTAINABLESHIP-1 notation by Class BV

Armada Olombendo

  • GTG A, GTC A & B 4K services and Borescope Inspection

Armada TGT

Milestone reached 100MM/bbls produced

Armada Sterling

  • 5-yearspecial survey by
    ABS

98-2 Field

Karapan Armada Sterling III

• Zinc anode replacement on water

ballast tanks

Armada Sterling II

• New Coarse filter installation

  • Solar Turbines GTC-A/B package conditioning assessments

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Bumi Armada Bhd published this content on 26 August 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 26 August 2022 05:40:04 UTC.