Independent Technical Report on the West Bear
Project, Saskatchewan
Prepared for:
UEX Corporation
Prepared by:
James Hatley, P.Eng.
Fred Brown, P.Geo.
Effective Date: June 30, 2022
Issue Date: July 25, 2022
Hatley Engineering and Applied Technologies Inc.
Page i | |
Independent Technical Report on the West Bear Project, Saskatchewan | July 25, 2022 |
SUMMARY
This report was prepared to provide an Independent Technical Report for the West Bear Cobalt- Nickel Deposit on the West Bear Property, Saskatchewan, Canada. The Independent Technical Report is required due to the NI 43-101 Standards of Disclosure for Mineral Projects, Section 5.3
- (c) (ii) "a 100 percent or greater change in the total mineral resources or total mineral resources on a property material to the issuer, since the issuer's most recently filed independent technical report in respect of the property."
The Independent Technical Report and updated Mineral Resource Statement prepared by James Hatley, P.Eng. of Hatley Engineering and Applied Technologies Inc. ("Hatley Engineering") and Fred Brown, P.Geo. It was prepared following the guidelines of the Canadian Securities Administrators' National Instrument 43-101 and Form 43-101F1. Additional guidance was obtained from Companion Policy 43-101CP. It also discloses the material results from exploration activity conducted during 2020 and 2021 on the property, specifically on the Umpherville and Michael Lake grids.
The West Bear Property (the "Property") is a mid to advanced stage exploration project located in Saskatchewan, Canada. UEX Corporation ("UEX") owns 100 percent of the West Bear Property.
UEX Corporation - West Bear Project | Hatley Engineering and Applied Technologies Inc. |
Page ii | |||
Independent Technical Report on the West Bear Project, Saskatchewan | July 25, 2022 | ||
TABLE OF CONTENTS | |||
LIST OF FIGURES ................................................................................................................... | vi | ||
LIST OF TABLES ..................................................................................................................... | ix | ||
1.0 | SUMMARY .................................................................................................................... | 1 | |
1.1 | Introduction ......................................................................................................... | 1 | |
1.2 | Property Description and Ownership.................................................................... | 1 | |
1.3 | History................................................................................................................. | 2 | |
1.4 | Geology and Mineralization ................................................................................. | 3 | |
1.5 | Exploration and Drilling....................................................................................... | 4 | |
1.6 | Sample Preparation, Analyses and Security.......................................................... | 4 | |
1.7 | Data Verification.................................................................................................. | 5 | |
1.8 | Mineral Resource and Mineral Reserve ................................................................ | 5 | |
1.9 | Adjacent Properties and Other Relevant Data and Information............................. | 6 | |
1.10 | Conclusions and Recommendations ..................................................................... | 6 | |
2.0 | INTRODUCTION......................................................................................................... | 10 | |
2.1 | Work Program ................................................................................................... | 11 | |
2.2 | Basis of Technical Report .................................................................................. | 11 | |
2.3 | Qualifications of the Qualified Persons .............................................................. | 12 | |
2.4 | Site Visit............................................................................................................ | 12 | |
2.5 | Key Definitions.................................................................................................. | 13 | |
2.6 | Declaration ........................................................................................................ | 14 | |
3.0 RELIANCE ON OTHER EXPERTS ............................................................................. | 14 | ||
4.0 PROPERTY DESCRIPTION AND LOCATION .......................................................... | 15 | ||
4.1 | Mineral Tenure .................................................................................................. | 16 | |
4.2 | Mining Rights in Saskatchewan ......................................................................... | 19 | |
4.3 | Underlying Agreements ..................................................................................... | 19 | |
4.4 | Permits and Authorizations ................................................................................ | 19 | |
4.5 | Environmental Considerations ........................................................................... | 20 |
5.0 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRCTURE AND
PHYSIOGRAPHY ........................................................................................................ | 22 |
5.1 Accessibility ...................................................................................................... | 22 |
UEX Corporation - West Bear Project | Hatley Engineering and Applied Technologies Inc. |
Page iii | |||
Independent Technical Report on the West Bear Project, Saskatchewan | July 25, 2022 | ||
5.2 | Local Resources and Infrastructure .................................................................... | 22 | |
5.3 | Climate .............................................................................................................. | 23 | |
5.4 | Physiography ..................................................................................................... | 23 | |
6.0 | HISTORY ..................................................................................................................... | 25 | |
6.1 | Property Ownership ................................................................................................. | 25 | |
6.2 | Exploration and Development History ..................................................................... | 25 | |
6.3 | Historical Mineral Resource Estimates..................................................................... | 26 | |
6.4 | Historical Productional Resource Estimates ............................................................. | 27 | |
7.0 GEOLOGICAL SETTING AND MINERALIZATION....................................................... | 28 | ||
7.1 | Regional Geology .................................................................................................... | 28 | |
7.2 | Property Geology..................................................................................................... | 31 | |
7.2.1 Wollaston Group ....................................................................................... | 31 | ||
7.2.2 Athabasca Group....................................................................................... | 34 | ||
7.2.3 West Bear Antiform .................................................................................. | 34 | ||
7.2.4 Structure.................................................................................................... | 34 | ||
7.3 | Mineralization.......................................................................................................... | 36 | |
7.3.1 West Bear Cobalt-Nickel Deposit .............................................................. | 36 | ||
7.3.2 West Bear Uranium Deposit ...................................................................... | 37 | ||
7.3.3 Michael Lake Occurrence.......................................................................... | 37 | ||
7.3.4 Pebble Hill Occurrence.............................................................................. | 38 | ||
7.3.5 North Shore Uranium Occurrence.............................................................. | 38 | ||
7.4 | Alteration................................................................................................................. | 38 | |
8.0 | DEPOSIT TYPES ......................................................................................................... | 40 | |
9.0 | EXPLORATION ........................................................................................................... | 41 | |
9.1 | Geophysics on the West Bear Property............................................................... | 41 | |
9.2 | 2019 Umpherville and Pebble Hill HLEM Geophysical Program ....................... | 42 | |
9.3 | Boulder Prospecting Survey............................................................................... | 47 | |
9.4 | Michael Lake and Huggins Lake HLEM Geophysics Program ........................... | 56 | |
9.5 | Exploration Targets............................................................................................ | 59 | |
10.0 | DRILLING.................................................................................................................... | 61 | |
10.1 Historical Drilling (1977 - 2007) ....................................................................... | 61 | ||
10.2 West Bear Cobalt-Nickel Deposit Drilling by UEX 2018 & 2019....................... | 61 | ||
10.3 UEX Exploration Drilling 2020 & 2021............................................................. | 62 |
UEX Corporation - West Bear Project | Hatley Engineering and Applied Technologies Inc. |
Page iv | |||
Independent Technical Report on the West Bear Project, Saskatchewan | July 25, 2022 | ||
10.3.1 West Bear Cobalt-Nickel Deposit Assay Results ..................................... | 70 | ||
10.3.2 Michael Lake Cobalt-Nickel Zone ........................................................... | 79 | ||
10.4 | Surveying........................................................................................................... | 84 | |
10.5 | Core Recovery ................................................................................................... | 85 | |
10.6 | Relationship Between Sample Length and True Thickness ................................. | 85 | |
10.7 | Drilling Procedures ............................................................................................ | 85 | |
11.0 SAMPLE PREPARATION, ANALYSES AND SECURITY ........................................ | 88 | ||
11.1 | Drill Core Sampling Method and Approach ....................................................... | 88 | |
11.2 | Sample Preparation and Analysis ....................................................................... | 89 | |
11.3 | Drill Core Density Data...................................................................................... | 91 | |
11.4 | Quality Assurance and Quality Control Programs .............................................. | 91 | |
11.4.1 Quality Assurance and Quality Control Programs.................................... | 92 | ||
11.4.2 Blanks ..................................................................................................... | 92 | ||
11.4.3 Reference Materials................................................................................. | 93 | ||
11.4.4 Reproducibility of Laboratory Pulp Duplicates ...................................... | 100 | ||
11.4.5 Field Duplicates .................................................................................... | 100 | ||
11.4.6 Check Assays ........................................................................................ | 106 | ||
11.5 | Database Validation ......................................................................................... | 112 | |
11.6 | Security............................................................................................................ | 112 | |
11.7 | Summary ......................................................................................................... | 113 | |
12.0 | DATA VERIFICATION ............................................................................................. | 114 | |
12.1 Site Visit and Independent Sampling.................................................................... | 114 | ||
12.1.1 Independent Samples............................................................................. | 114 | ||
12.1.2 Independent Survey Check .................................................................... | 117 | ||
12.2 | Database Verification....................................................................................... | 118 | |
12.3 | Author's Comments on Adequacy of Data ....................................................... | 118 | |
13.0 MINERAL PROCESSING AND METALLURGICAL TESTING.............................. | 119 | ||
14.0 | MINERAL RESOURCE ESTIMATE ......................................................................... | 120 | |
14.1 | Introduction ..................................................................................................... | 120 | |
14.2 | Data Supplied .................................................................................................. | 120 | |
14.3 | Economic Assumptions.................................................................................... | 123 | |
14.4 | Mineralization Modeling................................................................................. | 124 | |
14.5 | Exploratory Data Analysis ............................................................................... | 125 |
UEX Corporation - West Bear Project | Hatley Engineering and Applied Technologies Inc. |
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
UEX Corporation published this content on 09 August 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 09 August 2022 17:48:07 UTC.