Rio Tinto Group provided production guidance for the year 2022. For the year, the company expects Pilbara iron ore 320 Mt to 335 Mt. Bauxite production of 54 to 57 Mt.

Alumina production of 7.6 to 7.8 Mt. Aluminium production of 3.0 to 3.1 Mt. Mined copper production of 500 to 575 kt.

Refined copper production of 230 to 290 kt.