Kingwest Resources Limited announced that Drilling Recommences at Sir Laurence Gold Discovery. Drilling in 2021 following discovery of this system exceeded expectations with significant intersections on every line of drilling over more than 2km strike length and up to 500m across strike. Some of best results were
within the last round of drilling which augers well for the continued success at Sir Laurence. In addition, the planned initial 3,000m diamond core drilling program is scheduled to commence in February 2022, with a new customised drill rig already onsite. This will be a critical programme in delineating the primary mineralised controls within Sir Laurence so will be in a position to potentially define economic gold resources in the future. This new 4,000m programme is designed to test for further extension to the Sir Laurence which remains open in all directions. In 2021 significant mineralisation was intersected on all 14 lines of drilling over a 2km strike length. Recent aircore intersections from the northern extents of Sir Laurence in late 2021 included 12m @ 0.7 g/t Au from 64m in KGA0693 (Line I), 16m @ 1.4 g/t Au from 64m in KGA0694 (Line J), 12m @ 0.8 g/t Au from 64m in KHA0736 (Line K) and 12m @ 0.7 g/t Au from 60m in KGA07011 (Line L) demonstrate the huge potential for further discoveries within the mineralised system as well as the potential for further extensions to the system. Outside of Sir Laurence drillholes on regional lines returned numerous significant intersections from lines 22, 19 and 8. These included 8m @ 5.0 g/t Au from 12m in KGA07301 1.5km to the west of Sir Laurence on line 8. The Goongarrie Gold Project has exceptional potential for multiple discoveries including a major discovery and the results to date support and enhance this potential.