iTech Minerals Ltd. announced kaolin results upgrade REE content by 176% at caralue bluff. Summary: Rare earth element content of high purity kaolin upgraded by 176% during beneficiation; Laboratory results on the -45-micron fraction confirm widespread, thick intervals of high purity white kaolin mineralisation with very low contained deleterious elements; Significant results from -45-micron fractions include: CBAC22-200 - 5m at 37.6% Al2O3, 0.6% Fe2O3, 0.28% TiO2, 0.07% CaO and 1902 ppm TREO from 11m (62% yield); CBAC22-203 - 5m at 36.9% Al2O3, 0.5% Fe2O3, 1.08% TiO2, 0.02% CaO and 1241 ppm TREO from 5m (58% yield); CBAC22-144 - 8m at 36.8% Al2O3, 0.22% Fe2O3, 0.78% TiO2, 0.02% CaO and 1687 ppm TREO from 10m (70% yield); CBAC22-138 - 14m at 36.4% Al2O3, 0.88% Fe2O3, 0.70% TiO2, 0.07% CaO and 839 ppm TREO from 10m (67% yield); CBAC22-162 - 6m at 35.9% Al2O3, 0.61% Fe2O3, 1.19% TiO2, 0.04% CaO and 1679 ppm TREO from 14m (72% yield); Results suggest potential to leach upgraded REEs from high purity kaolin fraction as part of the kaolin processing flow sheet; Low CaO suggests low acid consumption in REE leaching stage; Mineralisation is rich in key magnet REEs (Nd-Pr-Dy-Tb) averaging 25% of the REE basket.