Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement.

VOLUNTARY ANNOUNCEMENT POWER GENERATION FOR THE YEAR OF 2017

China Power Clean Energy Development Company Limited (the "Company") announces that, according to the Company's preliminary statistics, the combined total power generation of the Company and its subsidiaries (collectively the "Group") from 1 January to 31 December 2017 (the "Year") was 9,940,496.33 MWh, representing a decrease of 2.2% when compared to the same period of 2017.

Since (i) the volume of base power generation allocated by the government to the project located in Guangdong Dongguan decreased as a result of power market reform in Guangdong Province; and (ii) the decrease in water volume in Fujian area when compared to last year affected the volume of power generated in that region. Thus, the total power generation of the Group for the entire year declined when compared to 2016.

On the other hand, as a result of (i) the improvement in situation of photovoltaic power curtailment; (ii) the improvement in situation of wind power curtailment; (iii) the significant increase in power generation of Zhejiang Yunhe Photovoltaic Power Project, Fujian Zhangpu Photovoltaic Power Project, and Sichuan Panzhihua Photovoltaic Power Project; (iv) the commencement of commercial operation of Anhui Wuhu Waste-to-Energy Power Project, Hubei Macheng Chunyangshan Wind Power Project, Fujian Zhangpu Photovoltaic Power Project, Jiangxi Jian Aoli Photovoltaic Power Project, and Phase I of Fujian Zhaoan Photovoltaic Power Project this year; the extent of net decline therefore reduced.

A comparison between power generation by the main power generation units of the Group in the Year of 2017 and that of the year of 2016 is as follows:

ProjectInstalled Capacity

(MW)Power Generation for the Year of 2017 (MWh)Power Generation for the Year of 2016 (MWh)

Year-on-year

Changes

(%)I.

Natural Gas Projects

  • 1 Phase I of Guangdong Dongguan Project

    (廣東東莞一期項目)

  • 2 Phase II of Guangdong Dongguan Project

    (廣東東莞二期項目)

    • 360.00 932,956.10

    940.00

    1,042,882.10 -10.54%

    3,668,150.30

    3,737,290.50 -1.85%

    Sub-total of natural gas power projects

1,300.00

4,601,106.40

4,780,172.60 -3.75%II.

Waste-to-energy Power Projects

  • 3 Yunnan Kunming Project

    (雲南昆明項目)

  • 4 Phase I of Hainan Haikou Project

    (海南海口一期項目)

  • 5 Phase II of Hainan Haikou Project

    (海南海口二期項目)

  • 6 Anhui Wuhu Project1

    (安徽蕪湖項目)

    30.00

    24.00

    24.00

    24.00

    131,844.00

    156,169.00

    184,889.10

    51,295.20

    177,317.4 -25.65%

    159,219.2 -1.92%

    147,913.8

    -

    25.00%

    -

    Sub-total of waste-to-energy power projects

102.00

524,197.30

484,450.40 8.20%III.

Wind Power Projects

  • 7 Phase I of Gansu Jiuquan Project

    (甘肅酒泉一期項目)

  • 8 Phase II of Gansu Jiuquan Project

    (甘肅酒泉二期項目)

  • 9 Phase III of Gansu Jiuquan Project

    (甘肅酒泉三期項目)

  • 10 Phase IV of Gansu Jiuquan Project

    (甘肅酒泉四期項目)

  • 11 Phase V of Gansu Jiuquan Project

    (甘肅酒泉五期項目)

  • 12 Gansu Anbei Project

    (甘肅安北項目)

  • 13 Heilongjiang Hongqi Project

    (黑龍江紅旗項目)

100.50

193,694.8

196,774.20 -1.56%

49.50

60,281.7

44,334.30 35.97%

201.00

255,403.50

198,260.70 28.82%

100.50

134,990.10

92,139.90 46.51%

20.00

43,190.80

39,310.00 9.87%

601.00

823,241.80

651,761.60 26.31%

49.50

91,136.30

90,899.10 0.26%

Project

  • 14 Heilongjiang Hailang Project

    (黑龍江海浪項目)

  • 15 Jiangsu Dafeng Project

    (江蘇大豐項目)

  • 16 Inner Mongolia Chayou Zhongqi Project

    (內蒙古察右中旗項目)

  • 17 Hubei Macheng Chunyangshan Project2

    (湖北麻城純陽山項目)

  • 18 German Bönen Project (德國Bönen項目)

    Installed Capacity

    (MW)

    49.75

    200.25

    49.50

    80.00

    8.00

    Power Generation for the Year of 2017 (MWh)Power Generation for the Year of 2016 (MWh)

    Year-on-year

    Changes

    (%)

    107,830.10

    95,825.50 12.53%

    298,212.10

    305,719.60 -2.46%

    104,317.40

    97,144.70 7.38%

    92,960.20

    -

    -

    13,850.31 12,976.34 6.74%

    Sub-total of wind power projects

1,509.50

2,219,109.11

1,825,145.94 21.59%IV.

Hydro Power Projects

  • 19 Fujian Shaxikou Project

    (福建沙溪口項目)

  • 20 Fujian Niutoushan Project

    (福建牛頭山項目)

  • 21 Fujian Zhangping Huakou Project

    (福建漳平華口項目)

  • 22 Chongqing Meixihe Project

    (重慶梅溪河項目)

  • 23 Yunnan Yingjiang Hongfu Industrial Project

    (雲南盈江鴻福實業項目)

  • 24 Yunnan Yingjiang Huimin Project

    (雲南盈江惠民項目)

    300.00

    115.00

    36.60

    129.00

    64.00

    6.40

    1,031,646.60

    331,046.30

    87,821.00

    489,126.00

    182,470.97

    33,459.85

    1,631,952.10 -36.78%

    525,982.70 -37.06%

    184,117.30 -52.30%

    211,716.00 131.03%

    174,068.60 4.83%

    32,533.08 2.85%

    Sub-total of hydro power projects

  • 651.00 2,155,570.72

2,760,369.78 -21.91%V.

Photovoltaic Power Projects

  • 25 Phase I of Gansu Wuwei Project

    (甘肅武威一期項目)

  • 26 Phase II of Gansu Wuwei Project

    (甘肅武威二期項目)

  • 27 Phase I of Gansu Baiyin Project

    (甘肅白銀一期項目)

  • 28 Phase II of Gansu Baiyin Project

    (甘肅白銀二期項目)

20.00

32,538.10

37,029.20 -12.13%

30.00

35,056.80

30,435.10

15.19%

20.00

33,025.60

37,607.90

-12.18%

30.00

43,829.10

36,699.80

19.43%

Project

  • 29 Phase III of Gansu Baiyin Project

    (甘肅白銀三期項目)

  • 30 Gansu Guazhou Project

    (甘肅瓜州項目)

  • 31 Hainan Changjiang Project

    (海南昌江項目)

  • 32 Yunnan Yuanjiang Project

    (雲南元江項目)

  • 33 Fujian Zhangpu Project3

    (福建漳浦項目)

  • 34 Sichuan Panzhihua Project

    (四川攀枝花項目)

  • 35 Jian Project

    (江西吉安項目)

  • 36 Guangdong Dongguan Huimei Project

    (廣東東莞慧美項目)

  • 37 Jiangxi Jian Aoli Project4

    (江西吉安坳里項目)

  • 38 Phase I of Fujian Zhaoan Project5

    (福建詔安一期項目)

  • 39 Zhejiang Yunhe Project

    (浙江雲和項目)

    Installed Capacity

    (MW)

    15.00

    8.00

    20.00

    20.00

    80.00

    34.32

    14.07

    0.80

    2.50

    20.00

    5.24

    Power Generation for the Year of 2017 (MWh)

    23,749.00

    14,439.90

    28,806.40

    26,052.10

    83,555.60

    49,857.30

    13,764.50

    901.50

    1,564.90

    12,425.00

    6,260.60

    Power Generation for the Year of 2016 (MWh)

    Year-on-year

    Changes

    (%)

    18,755.90 26.62%

    12,240.50 17.97%

    26,551.40 8.49%

    28,945.50

    -10.00%

    22,135.50 277.47%

    20,035.90 148.84%

    6,807.70 102.19%

    488.50 84.54%

    -

    -

    -

    -

    1,499.70 317.46%

    Sub-total of photovoltaic power projects

319.93

405,826.40

279,232.60 45.34%VI.

Other Energy Projects

  • 40 Jiangsu Hongze Biomass Project

    (江蘇洪澤生物質項目)

  • 41 Jiangsu Hongze Thermal Power Project

    (江蘇洪澤熱電項目)

    Sub-total of other energy projects

    15.00 6.00

    21.00

    15,432.40 19,254.00

    34,686.40

    -

    -

    34,306.10 -43.88%

    34,306.10 1.11%

    Aggregate amount for projects which are controlled by the Group

3,903.43

9,940,496.33

10,163,677.42 -2.20%

Notes:

1

Anhui Wuhu Waste-to-energy Power Project with 24MW installed capacity commenced operation

in September 2017.

2

Hubei Macheng Chunyangshan Wind Power Project with 80MW installed capacity commenced

operation in September 2017.

3

Fujian Zhangpu Photovoltaic Power Project with commenced operation at maximum installed

capacity of 80MW in June 2017.

4

Jiangxi Jian Aoli Photovoltaic Power Project with 2.5MW installed capacity commenced operation

in July 2017.

5

Phase I of Fujian Zhaoan Photovoltaic Power Project with 20 MW installed capacity commenced

operation in July 2017.

Certain figures included in this announcement have been rounded to the nearest integer or rounded to two decimal places. Any discrepancies between the total shown and the sum of the amounts listed are due to rounding.

The figures set out in this announcement have not been audited and may differ from the final actual figures. Investors are reminded to exercise caution when dealing in the shares of the Company.

By order of the Board

China Power Clean Energy Development Company Limited

Wang Binghua

Chairman

Hong Kong, 26 January 2018

As at the date of this announcement, the board of directors of the Company comprises four executive directors, namely Mr. Wang Fengxue, Mr. Zhao Xinyan, Mr. He Hongxin and Mr. Qi Tengyun; three non-executive directors, namely Mr. Wang Binghua, Mr. Bi Yaxiong and Mr. Zhou Jiong, and four independent non-executive directors, namely Mr. Chu Kar Wing, Dr. Li Fang, Mr. Wong Kwok Tai, and Ms. Ng Yi Kum.

*

For identification purposes only

China Power New Energy Development Co. Ltd. published this content on 26 January 2018 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 26 January 2018 09:44:04 UTC.

Original documenthttp://www.cpne.com.hk/attachment/2018012617320200003032369_en.pdf

Public permalinkhttp://www.publicnow.com/view/735D67876922A047A4B965B26DD35992305C81B6