City of Saskatoon : Asphalt Repairs at Circle Drive South & Valley Road Starts Tomorrow

Envoyer par e-mail
07/18/2017 | 01:42 am

Starting at 9 a.m. on Tuesday, July 18, the westbound curb lane on Circle Drive South beneath the Valley Road interchange will be closed for approximately two days. The needed warranty work includes excavation, repair of the road structure and repaving.

Two through lanes will stay open, however, drivers heading down the Valley Road ramp to join Circle Drive traffic will need to yield to vehicles on Circle Drive before proceeding.

The speed limit will be reduced to 60km/h through the construction zone for the safety of drivers and workers on site.

This work will be completed weather permitting and barring any unforeseen circumstances.

City of Saskatoon published this content on 17 July 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 17 July 2017 23:42:03 UTC.

Envoyer par e-mail